Versions in force
| Standard | Reference | Status |
|---|---|---|
| Effinature New Construction | NCO 8.1 Download from effinature.com | In force |
| Effinature Evolution | EVO 8.1 Download from effinature.com | In force |
| Effinature Horizon | HOR 8.1 Download from effinature.com | In force |
| Effinature High Ecological Value (addendum) | HVE 8.1 Download from effinature.com | In force |
| Biodiversity Performance Score | BPS 2026.05 | In force |
| Low-carbon construction site | CBCA | Standard in preparation |
The 2020 generation (BAT 20-001, REN 20-001, AME 20-001) and the 25.05 generation remain applicable to operations started under them, until their completion; no new contract is concluded under them after 31 December 2026. The versions in force are made available free of charge on effinature.com; the earlier versions, since 2010, can be downloaded from the version gallery. Only the version in force is authoritative.